itnlenfrdeelrues
 

Contact now

invalid value
invalid value
invalid value
invalid value
invalid value
invalid value
invalid value
By submitting this form, I agree to personal privacy

The spreadsheet dimensioning requirements, the storage tank, the power of the generator (boiler or heat pump) for the production of domestic hot water inaccommodationsuch as hotels, guesthouses, inns, cottages, bed and breakfast.

Fill out the form and you will receive the results of real-time calculation

Single rooms with shower:
Single room with bath:
Single rooms with wash basin:
Double rooms with shower:
Double room with bath:
Double room with wash basin:
Inlet temperature:
Temperature distribution:
Storage temperature:
Duration tip withdrawal:
Preheating duration:

Name:
Last name:
Sector:
Province:
Email:
I consent to personal data processing:

The spreadsheet allows you to calculate the maximum flow of hot water, the power of the heat generator (boiler or heat pump) the volume of the tank in the accommodation facilities such as hotels, pensions hotels, cottages, bed and breakfast.

Rossato Group Srl
Headquarters: Via del Murillo, km 3.500 - 04013 Sermoneta LT - Italy
registered address via Migliara 49, No. 9 - 04016 Sabaudia LT - Italy
Cap. Soc. € 119.900,00 iv - n. LT-107494 REA - VAT-CF IT01745300598

Timetables
From Monday to Friday
Morning 8: 30 - 12: 30
Afternoon 13: 30 - 17: 30