it Italian en English

Contact now

invalid value
invalid value
invalid value
invalid value
invalid value
invalid value
invalid value
invalid value
invalid value
invalid value
invalid value
Heating and cooling plasterboard ceiling

Design: Offices 130 m2
Heating and cooling
Radiant: Wall / Ceiling
Heat pump: AIR + MT410
Power term. / Fridge. kW: 13
Bergamo City Lombardy

Installer: G.EMME.C. SNC

The building renewal in buildings used as places of work (offices, laboratories, workshops, etc.). Always require rapid construction works and side effects minimized.

In this paper, the client has requested to redevelop an attic of office space as quickly as possible, in order to be able to use the new offices in a certain time and fast. He also had the need to insulate the ceiling of the attic, built with old criteria about 30 years ago.

So for this application has been installed the system with radiant plasterboard Ecowall Dry, with installation on walls and ceilings. The panel is a prefabricated system that, with a single solution, acts as a trim panel (plasterboard), heating, air conditioning in summer and thermal insulation.

For winter heating and summer cooling, has been chosen heat pump with high efficiency AIR + MT.

Un dehumidification system ensures the best levels of humidity for optimum yield of the system during the summer and an ideal level of hygroscopic values ​​for employees, during the hot season.

For information on how to save on heating
Contact our area representative in Lombardy

air conditioning Bergamo Installing drywall panels heating ceiling plasterboard wall Grouting ceiling radiant wall

Rossato Group Srl
Headquarters: Via del Murillo, km 3.500 - 04013 Sermoneta LT - Italy
registered address via Migliara 49, No. 9 - 04016 Sabaudia LT - Italy
Cap. Soc. € 119.900,00 iv - n. LT-107494 REA - VAT-CF IT01745300598

Schedule
From Monday to Friday
Morning 8: 30 - 12: 30
Afternoon 13: 30 - 17: 30